Worst Builder & Worst Construction
Aug 10, 2024 08:45 PM
1217 views
(via Mobile)
Product Implementation Rate:
1) Very low quality and unbranded Lift.
2) Rain Water entering in all Electrical and CCTV pipelines. See the photos.
3) No Sunshade provided in the Windows. Rain water entering through windows. See the photos.
4) No proper weaterproof tiles work in the terrace. Lot of gaps between tiles. See photos.
5) Door access key pad buttons not working within 3 months.
6) Tiles & Granite work is very poor in the parking walls. Falling down. See photos.
7) Poor quality Main Gates
8) Unskilled Labours. Poor work in the total building.
9) Pressure Motor is not woekibg for the past 12 months.
10) Electrical works are bad.
11) Be carefull with the Builder. They will ask full paymeny settlement before handing over flat. But they won’t do pending work properly.
Upload photo files with .jpg, .png and .gif extensions. Image size per photo cannot exceed 10 MB