May 08, 2016 02:52 PM 21028 views

Customer Service:

Staff Courtesy:

Product Implementation Rate:

This is with reference to myrecent visit to Beverlee, Casa Rio Gold flat


> of mine along with my family.


>


> Pl note our following detailed observations for reference to all customers:


>


> 1. It is extremely sad to see such shabby condition of the outside


> finish /color of the building. There is big difference between the


> photograph shown in mylodha portal and the ground reality.The building


> outside/outer wall looks like that it's 8-10 year old building.


> Definitely not acceptable and expected from a builder of Lodha Repute.


>


> 2. Now, see what we felt while preparing ourselves to enter to the


> flat. The main door lock itself was found faulty and after lot of


> efforts, Mr. Avishkar(your representative accompanying us) could


> manage to open it. The lock has to be changed by new one.


>


> 3. Poor quality false ceiling material used in toilets. Area between


> this false ceiling and true ceiling of'toilet' is not even finished


> with proper plastering and proper painting. Geyser is just hanged on


> un-finished wall. In long run it will lead to leakages from upper


> level /other places.  Not acceptable. Pl arrange to first do a proper


> plastering, number of coats of paint on this area to be applied and


> then, re-install the geyser. Ideally, tiling is done till top,


> however, atleast we can expect a proper painted finished surface.


>


> This comment is applicable for both the toilets.


>


> 4. Utilities PVC pipes(of 3' or 4' dia) are found running above


> this false ceiling. We never seen laying of such dia piping with-in


> customer flat.It may smell, leak and create all sorts of problem over


> a period of time. It's a design flaw. Running pipes of such diameters


> over false ceiling inside the toiler /flat area is never seen earlier.


> These must pass through a dedicated utility ducts as per standard


> engineering and construction practices.


>


> 5. The outdoor unit of AC has been installed in a completely


> in-accessible position. This is again a serious design flaw.


> Removable of outdoor unit is almost impossible. How to handle it in


> case in future somebody want to replace the AC by new one.


>


> Is it the way Lodha designed the flats? It's in-human & highly


> un-safe for any xyz person to do maintenance on these outdoor units.


> Definitely not acceptable. Let us have the inputs on this from your


> design team and how it can be addressed now.


>


> 6. The switch for a 1.5 ton(pl confirm, it's 1.5 ton or other rating)


> AC is of 5 amp rating which is not sufficient. It needs minimum 16 amp


> power switch. Pl arrange to change it, otherwise, it will burn with-in


> few days. It's a safety hazard to use a lower rating switch for a


> higher rating device.(The plug /socket are correctly given of 16 amp


> rating.).


>


> We could not find any Star rating on AC. Is it 3 star or 5 start or


> what? Pl confirm.


>


> 7. Jet spray of toilet is leaking. Pl replace it by a new Piece. Local


> poor quality of jet spray is used; though Jaguar fittings were


> committed. Very few fittings are found of Jaguar, most of the fittings


> are low quality local makes. Definitely not of the standard shown in


> sample flats.


>


> 8. Plastering in main hall balcony area(Chajja portion) was literally


> cracking/hanging and just by touching, it came out. Proper curing time


> post plastering seems to be not given, hence, the condition. This


> needs to be fully removed, re-plastered and refinished properly as if


> it broken, it can be a safety hazard to a person standing at ground


> level.


>


> 9. Steel Railing of the main hall balcony started corroding. The paint


> has started peeling off from places. This is again happening due to


> improper surface treatment, primer application before final paint.


> This can be only rectified on permanent basis once the complete paint


> is peeled off and proper primer and proper quality paint is applied.


>


regards


Please rate this review usefulnessRating Breakup

Very Useful (39%)

Useful (61%)

Not Useful (0%)

Comment on this review